Home city of the first double-10KV distribution line construction

Main tasks: Based on production, new steel pipe tower 4 base, the new pole 52 base, conducting wire 14.83KM cable, 0.83KM, install vacuum switch 4, installation of high voltage lightning arrester 14 groups, making the cable head 12 and related accessories installation.